MOSHOFSKY INDOOR PRACTICE FACILITY & DUCK SHOP

University of Oregon,
Eugene, Oregon

This facility needed to be large enough to hold a football field and auxiliary areas. It would also have to be tall enough to accommodate the team's punters. The department decided on a 70-foot clearance at the building's center, which would make the roof 82 feet high at it's peak. The massive facility could not dwarf the adjoining Len Casanova Center.

Engineers at Butler Manufacturing's Visalia California plant, working with Chambers Construction and the rest of the project team, modified the building's widespan structural frame system to produce the desired roof and eave heights. The indoor practice area also has a 120-meter, four-lane track with synthetic surface.


Authorized
Pre-Engineered
Steel Builder

 

 

 

 

 

 

 




 

 


Arrow BUTLER STEEL
  • Indoor Practice Field, 120-Meter Running Track, Indoor Tailgating Facility & the DuckShop.
  • 117,000 sq. ft.
  • Butler Widespan Pre-Engineered System.
  • Removable floor, bandstand, etc. for indoor tailgate parties.
  • Two football classrooms with video projector.
  • A varsity lounge for student-athletes.
  • An auxiliary medical treatment facility
    
 
Arrow Under Construction
 

Bill Moos
“...the people of Chambers Construction were wonderful to work with and paid special attention to all the important components of the job, such as budget, timeline and the finished product.”

Bill Moos,
Former Director of Athletics, University of Oregon